What hours can construction noise take place?

The following noise disturbances are exempt from the provisions of County Code Section 6.12.010 between the hours of 7 a.m. and 10 p.m. or when conducted beyond one thousand feet of any residence where human beings reside and sleep at any hour.

-Sounds originating from temporary construction sites because of construction activity;

-Sounds originating from forest harvesting and sylvicultural activity;

-Sounds originating from the quarrying, blasting and mining minerals, including, but not limited to, sand, gravel, rock, and clay, as well as the primary reduction and processing of minerals or materials for concrete batching, asphalt mixing, and rock crushers.

Read County Code Section 6.12 for further information.

Show All Answers

1. How do I apply for a building permit?
2. What construction codes are in effect in the unincorporated areas of the County?
3. What design criteria do I use for designing a building?
4. How long is my permit good for?
5. What is the basic minimum snow load for Spokane County?
6. Do I need a permit for a fence?
7. Do I need a fence around my swimming pool?
8. Is there radon in Spokane County?
9. Do I have to mitigate my home for radon?
10. How do I apply for a manufactured home permit?
11. What is an egress window and when is it required?
12. What hours can construction noise take place?
13. How do I get an address assigned to my property?
14. Where do I get my electrical permit?
15. How high can a fence be?
16. How often can you amend the Comprehensive Plan?
17. What are my setbacks?
18. What are Critical Areas?
19. What requirements apply within critical Areas?
20. Where can I find information about minimum lot sizes in Spokane County?
21. What are Critical Areas?
22. What requirements apply within Critical Areas?
23. Where can I find information about minimum lot sizes in Spokane County?
24. What is Construction Stormwater Permit Coverage?
25. How do I obtain a Food Establishment permit?