Road Construction and Maintenance Update
June 15-19, 2020
SPOKANE COUNTY, June 12, 2020 – As road construction and maintenance projects continue throughout the county, we remind motorists to slow down in work zones.
CONSTRUCTION
Bigelow Gulch Phase 5
Road closed for excavation with local access only. Completed: 08/31/2020.
- Progress Rd: from Forker Rd to Forker Rd
Road Closed use alternate Route
Blanchard Creek Road Culvert ReplacementReplace Existing Culvert. Start: 6/15/2020. Completed: 10/31/2020.
- This work provides for the improvement of the Blanchard Creek Road. Work includes the removal of the existing culverts and the construction of a new structure over Blanchard Creek
Geiger Boulevard-Hayford Road to Soda RoadImprovement of Geiger Blvd. includes roadway excavation, curb, drywells, signing, and signals. Completed: 06/30/2020.
- Hayford Rd: from 53rd Av to Geiger Bv
Road is open during shoulder work. Flaggers may be present (both directions, all lanes). - Geiger Bv: from Hayford Rd to Thomas Mallen Rd
Road is closed east of Amazon. Thomas Mallen Closed. Detour using Hayford, 53rd, Electric. Amazon access via Geiger from Hayford. - Geiger Bv: from Thomas Mallen Rd to Soda Rd
Road is closed to through traffic. Detour using Hayford, 53rd and Electric. Amazon access via Thomas Mallen & Geiger.
Mead-Mt. Spokane SewerInstall sewer, manholes, and road reconstruction. Completed: 07/31/2020.
- Day-Mt Spokane Rd: from US-2 (Newport Hy) to US-2 (Newport Hy)
Road Closed: Day Mount Spokane West of HWY 2 to Freya Road closed to through Traffic.
Mill Road- Hastings to DartfordRoad Reconstruction. Completed: 10/31/2020.
- Mill Road is closed from Hastings to Dartford. Access to local properties will be maintained. Detour using Hastings, US395, Wandermere and Dartford.
PRIVATE CONTRACTOR WORK BY PERMITAvista Lane ClosureLane Closure on Havana. Start: 06/15/20. Completed: 06/19/2020.
- Havana St: from Spokane City Limits to Fairgrounds Rd
Eastbound, right lane is closed. AVISTA TO CHANGE OUT POLES AND STRING SVC WIRE.
Liberty Lake Eastside Water ImprovementsReplace water line on Neyland. Completed: 09/30/2020.
Halme Construction: (509) 725-4200
- Neyland Rd: from Lakeside Rd to Gage St
Road closed for water line replacement.
Quanta Telecom - Shoulder ClosureUNDERGROUND CABLE INSTALLATION. Completed: 07/15/2020.
- Government Wy: from River Ridge Blvd to Ft George Wright Dr
Lane Restrictions (northbound, shoulder): SHOULDER CLOSURE - LANE SHIFT.
MAINTENANCE (Road maintenance projects are subject to change due to weather conditions and other road maintenance priorities)Asphalt Overlay on County RoadsAsphalt overlay on Mullinix Rd, from the Cheney City Limits on south to Pine Springs Rd. Expect flaggers and lane restrictions. Start: 06/15/20. Completed: 06/18/2020.
- Mullinix Rd: from UPRR Crossing #31222 (Cheney City Limits) to Pine Spring Rd
Asphalt overlay on Mullinix Rd, from the Cheney City Limits on south to Pine Springs Rd. Expect flaggers and lane restrictions.
Crack Sealing Crack Sealing on Waikiki Rd from Wall St to Mill Rd. Expect flaggers and lane restrictions. Start: 06/15/20. Completed: 06/18/2020.
- Waikiki Rd: from Whitworth Dr to Mill Rd
Crack Sealing on Waikiki Rd from Wall St to Mill Rd. Expect flaggers and lane restrictions.
Crack SealingCrack Sealing on Martin Rd from Lincoln County Line to Mullinix Rd. Expect flaggers and lane restrictions. Start: 06/15/20. Completed: 06/18/2020.
- Martin Rd: from Lincoln County Line to Mullinix Rd
Crack Sealing on Martin Rd from Lincoln County Line to Mullinix Rd, expect lane restrictions and flaggers.
Crack SealingCrack Sealing on Mullinix Rd from Martin Rd to Cheney City Limits, expect lane restrictions and flaggers. Start 06/15/20. Completed: 06/18/2020.
- Mullinix Rd: from Martin Rd to UPRR Crossing #31222 (Cheney City Limits)
Crack Sealing Mullinix Rd from Martin Rd to Cheney City Limits, expect lane restrictions and flaggers.
Euclid Rd Bridge ClosureEuclid Rd Bridge Closure Detour route in place. Work on bridge to be completed by BNSF.
- Euclid Rd: from Bridge #1508 Over BNSF to Lyons Rd
Road closed for the Euclid Rd bridge closure.
Gravel Road StabilationSpangle Creek Rd, grading and prepping for base stabilization. Start 06/15/20. Completed: 06/18/2020.
- Spangle Creek Rd: from US-195 to Yale Rd
Slow-moving vehicle (both directions, all lanes): Spangle Creek Road, grading and prepping for base stabilization.
Gravel road stabilizationPrepping Gerlach Rd by grading, for base stabilization. Start: 06/15/20. Completed: 06/18/2020.
- Gerlach Rd: from Freya St to Orchard Rd
Slow-moving vehicle (both directions, all lanes): Grading Gerlach Rd and Orchard Rd as prep for gravel stabilization.
Storm Drain/Culvert CleanoutCrews will be using a Vactor Truck in the Valley-Ford area to cleanout culverts and drywells. Completed: 06/25/2020.
- Please stay back and use caution when around Vactor crews watch for flaggers.