[ARCHIVED] Road construction and maintenance update for September 8-15, 2023.

SPOKANE COUNTY PUBLIC WORKS - ROAD CONSTRUCTION AND MAINTENANCE 

September 9 to September 15, 2023 - http://www.spokanecounty.org/3828/Weekly-Travel-Impacts-Map

SPOKANE COUNTY ROAD CONSTRUCTION (509) 477-3600

Bigelow Gulch Mitigation
Improvement of the Bigelow Gulch Road Offsite Mitigation site located along Minnie Creek near Fish Lake Regional Park by clearing and grubbing, temporary irrigation, grading, planting and other work. Estimated completion date: September 30, 2023.

 

Bigelow Gulch Project # 2- Francis Ave & Havana -Weile Ave and Bradley Ave
Improvement of Bigelow Gulch Road from the Urban Boundary to Weile by reconstructing the road to a wider section on a new alignment by clearing and grubbing, roadway excavation, embankment compaction, culvert pipe, cement, illumination & traffic control. Estimated completion date: September 2025.

 

Bigelow Gulch Rd: from Weile Av to Palmer Rd
 
Lane restrictions (both directions, all lanes): Lane closures, watch for flaggers.

 

Weile Av: from Bigelow Gulch Rd to Bradley Rd
 
Road CLOSED


Brooks Road Reconstruction
Improvement of Brooks Road by reconstruction and widening by clearing and grubbing, roadway excavation, embankment compaction, cement spreading, crushed surfacing, hot mix asphalt, contractor designed underground structure, beam guardrail and other work. Estimated completion date: September 8, 2023.

Brooks Rd: from Medical Lake City Limits to Thorpe Rd           
Road CLOSED! No traffic is allowed through from railroad tracks just north of city limits to Hallett to allow replacement of the drainage structure just north of the tracks. 

 

Columbia Dr-Girard to Northwood
This contract provides for the improvement of Columbia Drive – N Girard Lane to N Northwood Drive. The project includes constructing ADA ramp retrofits, median island construction, HMA grinding and paving, pavement markings, project temporary traffic control and other work. Estimated completion date: October 31, 2023.


 
Columbia Dr: from Northwood Dr to Girard Ln
 
Lane restrictions (both directions, all lanes). Watch for flaggers.


Euclid Road Bridge No. 1508 
Removing and constructing new bridge and road approaches; including asphalt pavement, signing, striping, erosion control, filter drain, installing beam guardrail, and miscellaneous structures. Estimated completion date: late-November 2023.

Euclid Rd: from Bridge #1508 over Burlington Northern Santa Fe tracks to Lyons Rd. Road CLOSED: Bridge is CLOSED. Use Detour.


Lincoln Road and Sewer
Project includes improvements to Lincoln Road from Market Street to Crestline Street by replacement of the entire roadway, widening vehicle travel lanes, the addition of stormwater management infrastructure, and moving pedestrians to new locations. 
https://www.spokanecounty.org/5214/Lincoln-Road-and-Sewer. Estimated completion date: September 29, 2023. 


 
Lincoln Rd: from Market St to Crestline St
 
Road CLOSED! Lincoln road is CLOSED with local access for businesses and residents. Watch for workers and equipment. There will be times and locations where the road will impassable!


Otis Orchards Elementary School SRTS Project
This project provides for the improvement of Wellesley Ave (from Milepost 2.11 at Arden Rd. to Milepost 2.46 at Lynden Rd.) by constructing curb extensions, marked crosswalk (includes illumination), school speed zone flashing beacons and signage, and ADA curb ramps. Estimated completion date: September 15, 2023 

PRIVATE CONTRACTOR WORK BY PERMIT

Permit # EN-23-1000 Liberty Lake Sewer and Water Replacement – Project No. 30221.047.03 & 30221.047.04
Contact: Evergreen Excavating – (208) 899-3941. Misc. work in the Spokane County right-of-way. Includes fire hydrant, road crossings, water main, and sewer main connections. Estimated completion date: October 31, 2023


Melkapsi St: from Liberty Dr to Wright Bv
 
Road CLOSED: Road closures along Liberty Drive, Wright, Melkapsi, Taft and Mitchell.


Permit Number EN-23-0749 for the Triple Bar WP and Gray’s Hayford Road Widening 

Contact: Piersol Construction – (509) 535-2901. Project includes frontage improvements: Asphalt paving, grading, sidewalk install/repair/demo/construct, curb/gutter/drainage facilities. Estimated completion date: September 12, 2023.


Hayford Rd: from 59th Av to Geiger Bv
Road CLOSED: Hayford Rd CLOSED from 59th Av to Geiger. 


CITIZEN EVENT BY PERMIT

Rim Ride

Contact: Jeff Duncan – (509) 868-6754. Annual Rotary in Motion – 15 miles along E. Appleway, Spokane Bridge, E. Indiana, N. Molter. 25 mile route – N. Barker Rd, around Carlson Hill. 50-100 mile bike ride around Liberty Lake area to Post Falls City Limits. September 10, 2023 from 7:00 a.m. to 2:00 p.m.


 
Appleway Av: from Spokane Bridge Rd to Idaho State Line
 
Flaggers may be present (both directions, all lanes).
 

SPOKANE COUNTY ROAD MAINTENANCE (509) 477-3600

Crews in all four road districts are patching potholes, spraying weeds and sweeping where needed. Grading is dependent on weather and road conditions.


-###-

The mission of Spokane County Public Works is to provide our citizens and the traveling public with safe and maintained roads, bridges and stormwater facilities through efficient and quality Operations, Construction, Engineering and Planning services.

Facebook Twitter Email

Other News in Public Works

  1. Spokane County WA Homepage

Contact Us

  1. Spokane County

  2. 1116 W Broadway Avenue

  3. Spokane, WA 99260

  4. Contact Us

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow