ROAD CONSTRUCTION AND MAINTENANCE
May 6-13, 2022
http://www.spokanecounty.org/3828/Weekly-Travel-Impacts-Map
ROAD CONSTRUCTION
Belle Terre Road
Project includes improvements to Belle Terre Road-Evergreen Road to Adams Road by planning existing pavement, cement treated base, HMA, storm sewer pipe, catch basins, drywells, traffic control and other work. Completed: August 30, 2022.
Belle Terre Av: from Sullivan Rd to Evergreen Rd
Road Closed – detours in place.
Belle Terre Av: from Terra Verde Dr to Adams St
Lane restrictions (both directions, all lanes). No access from Belle Terre Ave. Use South Ball Detour through May 20th. Watch for construction in the roadway and flaggers.
Bigelow Gulch Rd - Phase 6
Improvements to Bigelow Gulch Road include clearing and grubbing, roadway excavation, borrow, embankment compaction, precast concrete drywells, culverts, pedestrian tunnel, structure excavation, illumination system. Completed: October 31, 2022.
Forker Rd: from Bigelow Gulch Rd to Progress Rd
Lane Restrictions (Both Directions, All Lanes): Progress Road Opened at Bigelow Gulch/ Forker Road. Open at Progress Road. DETOUR ROUTE THROUGH 10/31/2022
Progress Rd : from Wellesley Av to Spokane Valley City Limits
Road closed: Progress Road from the intersection of Progress and Bigelow to the intersection of Crown and Progress. DETOUR ROUTE THROUGH 10/31/22
Sullivan Rd: from Upland Dr & Ct to Wellesley Av
Lane restrictions (both directions, all lanes). Watch for flaggers during construction.
Sullivan Rd: from Wellesley Av to north city limits of Spokane Valley
Road Closed: Sullivan Road from the intersection of Wellesley and Sullivan Road to the City limits ROAD IS CLOSED.
Wellesley Av: from Progress Rd to Tolford Rd
Lane restrictions (both directions, all lanes). Watch for flaggers during construction.
Waikiki Road Bridge
Improvement of the Waikiki Road Bridge No. 2606 -Rehabilitation of the concrete deck by scarifying the existing slab, replacing the concrete overlay, and asphalt approaches will be raised to match the new deck elevation *Project start 5/9/22*
Waikiki Rd: from Mill Rd to Rutter Parkway
Lane restrictions (both directions, all lanes). One-lane roadway over bridge will be controlled by automatic signals. Beginning May 20th the bridge will closed for weekend and a detour in place.
PRIVATE CONTRACTOR WORK BY PERMIT
Columbia - Northwood to Girard
Installation of a gas line. Completed: May 31, 2022.
Contact: MPL General Contractor: (509) 855-6718
Columbia Dr: from New York Ln to Girard Ln
Delays (both directions, all lanes). Slow down and watch for flaggers.
New Residential Short Plat SP-1704-22
Crews installing water, sewer and gas installations, UG electric, conduit, asphalt paving, construction and excavation. Completed: May 10, 2022.
Contact: ADK Excavation, Anthony Kottong (509) 710-1067
Locust Rd: from Upriver Dr to Maringo Dr
Locust Road is closed with a detour in place.
Whitworth Water Main Installation
Whitworth Water District – Zone 3 to Zone 8 transmission project. Completed: May 9, 2022.
Contact: Brad Willson: (509) 220-0424
Commellini Rd: from Dartford Dr to East End Of Road
Rolling road closure on Dartford into Commellini Road. ad Closed: ROLLING ROAD CLOSURE ON DARTFORD INTO COMMELLINI RD.
ROAD MAINTENANCE
(Road maintenance projects are subject to change due to weather conditions and other road maintenance priorities)
Spokane County crews are repairing potholes and grading gravel roads as the weather permits.
The mission of Spokane County Public Works is to provide our citizens and the traveling public with safe and maintained roads, bridges and stormwater facilities through efficient and quality Operations, Construction, Engineering and Planning services.