Bigelow Gulch Phase 3
Road Reconstruction (remove and replace), culverts, stormwater, guardrail and illumination system. Completed: August 31, 2021.
Weile Av: CLOSED from Bigelow Gulch Rd to Thierman Rd – through July 31,
2021. Detour through Jensen Road.
Bigelow Gulch Road: from Weile Avenue to Weile Avenue
Lane restrictions (both directions, all lanes): Only allowing access from Bigelow Gulch and Weile to the Koi Farm and Bill Johnson’s Differential Shop – through August 31, 2021.
Additional Info - Bigelow Gulch Phase 3
Road Closure – Dates: May 24 – June 14, 2021.
Bigelow Gulch Road: from Weile Avenue to Argonne Road
Road CLOSED. Look for electronic traffic signs for updates on the closure.
Centennial Trail
Roadway excavation, embankment compaction, culvert pipe, crushed surfacing top course, hot mix asphalt, silt fence, wattles, seeding and mulching, temporary traffic control, erosion control. From Nine-Mile Dam to Carlson. Completed: May 21, 2021.
Geiger Blvd - Soda to Grove Rd *****ROAD CLOSED FROM THOMAS MALLEN TO GROVE*****LOCAL BUSINESSES ARE OPEN!
New road, including drywells, asphalt, signing, pavement marking. Dowdy and Geiger Road are Open. Completed: June 30, 2021.
Geiger Blvd: from Thomas Mallen Road to Spokane City Limits (Electric Ave)
Lane Restrictions (Both Directions, All Lanes): Geiger at Grove is closed. Crews will be working on removing existing roadway. Use Alternate Route. Electric Avenue is open. Thomas Mallon is open. Local businesses are open, please use extreme caution when travelling inside the work zone. Spotted is CLOSED.
PRIVATE CONTRACTOR WORK BY PERMIT
Overlash and Installation of New Fiber
Crew is installing overlash 96 ct fiber from Pole #169394 at 5620 S. Regal to cross over clamp before Pole #432265 at 2821 E. 57th Ave. Completed: May 28, 2021.
Regal Road: from 57th Avenue to 57th Avenue
Expect lane restrictions (both directions, all lanes): Lane Shift – north and southbound on Regal at 57th Avenue.
Run Electric Power under Roadway
Avista crew will run electric power under roadway and dig into JE (JS0654) located on the south side of Stoneman Road and run power under Stoneman Road to the north. Completed: May 21, 2021.
Stoneman Road: from Argonne Rd to Stoneman Bluff Lane
Flaggers may be present (both directions, all lanes): Typical one-lane, two-way traffic control with flaggers.
STA Four Lakes Station
WM Winkler crews are paving First Avenue. The project includes the sidewalks, curbs and gutters – along with demolishing part of Spokane Street. 150-feet of road will be reduced to a seven-foot wide walking path south of First Avenue. Completed: July 30, 2021.
First Avenue: from Electric Ave. to Cheney Street.
ROAD CLOSED on First Avenue on the east and west side of Highway 904 from 8:00 a.m. to 5:00 p.m. as needed.
ROAD MAINTENANCE
(Road maintenance projects are subject to change due to weather conditions and other road maintenance priorities)
Asphalt Overlay on Craig Road from Thorpe Road to SR-902
Crews are applying an asphalt overlay on Craig Road from Thorpe Road to State Route-902. Expect flaggers and delays. Completed: May 25, 2021.
Craig Road: from SR-902 to Thorpe Road
Motorists should expect delays and watch for flaggers (both directions, all lanes).
Asphalt Overlay on Craig Road from Thorpe Road to McFarlane Road
Crews are applying an asphalt overlay on Craig Road from Thorpe Road to McFarlane Road. Expect flaggers and delays. Dates: May 26-27, 2021.
Craig Road: from McFarlane Road to Thorpe Road
Motorists should expect delays and watch for flaggers (both directions, all lanes).
Asphalt Overlay on Melville Road from Fruitvale Road to Spotted Road
Crews are applying an asphalt overlay on Melville Road from Fruitvale Road to Spotted Road. Expect flaggers and delays. Date: May 27, 2021.
Melville Road: from Fruitvale Road to Spotted Road
Motorists should expect delays and watch for flaggers (both directions, all lanes).
Crack Sealing on Old Trails Road from Inland Road to Trails Rd.
Crews are crack sealing on Old Trails Road from Inland Road to Trails Road. Expect lane restrictions and flaggers. Dates: May 24-27, 2021.
Old Trails Road: from Inland Road to Trails Rd.
Motorists should expect lane restrictions and watch for flaggers (both directions, all lanes).
Euclid Rd Bridge Closure
Euclid Rd Bridge is closed and a detour is in place. Replacing the bridge is the responsibility of the Burlington Northern Santa Fe Railroad.
Euclid Rd: from Bridge #1508 Over BNSF to Lyons Rd
Road Closed – Euclid Rd Bridge Closed
Grading and applying base stabilization on Spangle Creek Road from Hwy. 195 to Spangle Creek grade.
Grading and applying base stabilization on Spangle Creek Road from Hwy. 195 to Spangle Creek grade. Expect lane restrictions, flaggers and possible short closures. Dates: May 25 to June 2, 2021.
Spangle Creek Road: from Hwy. 195 to Valley Chapel Road
Motorists should expect delays (both directions, all lanes) in addition to flaggers and possible short delays.
Re-graveling Bridges Road from Madison Road to Elk-Chattaroy Road.
Crews are re-graveling Bridges Road from Madison to Elk-Chattaroy Road. Completed: May 27, 2021.
Bridges Road: from Madison Road to Elk-Chattaroy Road.
Lane restrictions (both direction, all lanes) and expect flaggers: Motorists should slow down in the work zone.
Re-graveling Frideger Road from Darknell Road to Madison Road.
Crews are re-graveling Frideger Road from Darknell Road to Madison Road. Completed: May 27, 2021.
Frideger Road: from Darknell Road to Madison Road.
Lane restrictions (both direction, all lanes) and expect flaggers: Motorists should slow down in the work zone.
Re-graveling Madison Road from Frideger Road to Bridges Road.
Crews are re-graveling Madison Road from Frideger Road to Bridges Road. Completed: May 27, 2021.
Madison Road: from Frideger Road to Bridges Road.
Lane restrictions (both direction, all lanes) and expect flaggers: Motorists should slow down in the work zone.
Shoulder Maintenance on Espanola Road, east of Ritchey Road
Crews are doing shoulder maintenance work on Espanola Road, east of Ritchey Road. Dates: May 24-25, 2021.
Espanola Road: from Ritchey Road to Thorpe Road.
Lane restrictions (both direction, all lanes): Motorists should slow down in the work zone.
Shoulder Maintenance on Old Trails Road from Trails Road to Inland Road
Crews are doing shoulder maintenance work on Old Trails Road from Trails Road to Inland Road. Dates: May 25-27, 2021.
Old Trails Road: from Trails Road to Inland Road
Lane restrictions (both direction, all lanes): Motorists should slow down in the work zone.
Spokane County crews are repairing potholes, sweeping and spraying weeds as the weather permits. For more information, go to: www.spokanecounty.org/publicworks