SPOKANE COUNTY PUBLIC WORKS                          

ROAD CONSTRUCTION AND MAINTENANCE 

APRIL 23-30, 2021 

www.spokanecounty.org/publicworks 

http://www.spokanecounty.org/3828/Weekly-Travel-Impacts-Map

 

ROAD CONSTRUCTION


Bigelow Gulch Phase 3
 Road Reconstruction (Remove and Replace), Culverts, Stormwater, Guardrail and Illumination system. Completed: August 31, 2021. 

Bigelow Gulch Rd: from Argonne Rd to Weile Av 
Flaggers May Be Present (Both Directions, All Lanes): Utilities are currently working in the right-of-way. 

 

Centennial Trail
 Roadway excavation, embankment compaction, culvert pipe, crushed surfacing top course, hot mix asphalt, silt fence, wattles, seeding and mulching, temporary traffic control, erosion control. From Nine-Mile Dam to Carlson.


Geiger Blvd - Soda to Grove Rd *****ROAD CLOSED FROM THOMAS MALLEN TO GROVE*****LOCAL BUSINESSES ARE OPEN!
 New Road, including Drywells, Asphalt, signing, pavement marking. Dowdy and Geiger Road are Open. Completed: June 30, 2021.

Geiger Bv: from Thomas Mallen Rd to Spokane City Limits (Electric Ave)
Lane Restrictions (Both Directions, All Lanes): Geiger at Grove is closed. Crews will be working on removing existing roadway. Use Alternate Route. Electric Avenue is open. Thomas Mallon is open. Local businesses are open, please use extreme caution when travelling inside the work zone. Spotted is closed. 


PRIVATE CONTRACTOR WORK BY PERMIT


Assembly Rd. from 29th Av. to Garden Springs Rd. 
Comcast-sub Sefnco crew installing overlash 48CT Fiber from pole #15 (019915) to pole #17 (086387) on the corner of Assembly and 29th. They will pull the 48CT Fiber through the existing riser on pole #17. The work will continue north into the City of Spokane limits. Completed: April 29, 2021. 

Assembly Rd: from 29th Av to Garden Springs Rd 
Lane Closed (Both Directions, All Lanes): Single Lane Closure with flaggers

 

Bridges Rd. west of Dunn Rd. on the north side of Bridges
 Avista crew will change out the pole at 9011 E. Bridges Rd. located west of Dunn Rd. on the north side of Bridges. Date: April 28, 2021.

Bridges Rd.: west of Dunn Rd. on the north side of Bridges. 
Flaggers May Be Present (both directions, all lanes): One Way - Two Way traffic with flaggers

Market St. from Farwell Rd. to Farwell Rd.
 ZeroDB Communications is the contractor for AYO Fiber relocation and bore crossing from the northwest corner of the intersection of Farwell and Market to the southwest corner of Farwell and Market. Completed: April 30, 2021. 

Market St: from Farwell Rd to Farwell Rd 
Flaggers May Be Present (Both Directions, All Lanes): 4-Way Flagging Operation and Sidewalk Closure.

 

Sewer Line Installation -Intersection of Windsor Rd. and Polk St.

MJM Grand crews will install a sewer line starting at the intersection of Windsor Rd. and Polk St. east on Windsor Rd. and north approximately 450-feet on Assembly Rd. Completed: May 7, 2021.

            Assembly Rd.: from 34th Ave. to 28th Ave.

Flaggers may be present (both directions, all lanes). Flaggers will be present on Assembly. Windsor Road is CLOSED at Assembly.

 

UG and Aerial Construction
Quanta Telecommunication Services crew will be doing UG and Aerial construction along Freya St. from 55th Av to 57th Av…and on the north side of 57th from Freya St. to the Palouse Highway and on the north side of 57th from Ben Burr Rd. to Dearborn Rd. Completed: May 10, 2021.

Freya St: from 55th Av to 57th Av 
Flaggers May Be Present (Both Directions, All Lanes): Flaggers Present on Freya St from 55th to 57th.

57th Av: from Ben Burr Rd to Yale Rd 
Flaggers May Be Present (Both Directions, All Lanes): Flaggers Present on 57th from Ben Burr Rd to Yale Rd.


Zayo Fiber Relocation and Bore Crossing
 ZeroDB Communications crew will be working on a Zayo Fiber relocation and bore crossing from the northeast corner of Farwell and Market intersection – to the southwest corner of Farwell and Market. Completed: April 30, 2021.

Market St: from Farwell Rd. to Farwell Rd. 
 
Flaggers may be present (both directions, all lanes): Four-way flagging operation and sidewalk CLOSURE. 


ROAD MAINTENANCE

(Road maintenance projects are subject to change due to weather conditions and other road maintenance priorities)


Crack Sealing Betz Rd. from Granite Lake Rd. to Cheney City Limits
 Crew will be crack-sealing Betz Rd. from Granite Lake Rd. to the Cheney City Limits. Expect flaggers. Completed: April 28, 2021.

Betz Rd.: from Granite Lake Rd to Cheney City Limits 
 
Lane restrictions (both directions, all lanes): Motorists need to watch for flaggers.


Crack Sealing Bradshaw Rd. from Starr Rd. to Town of Fairfield
 Crew will be crack-sealing Bradshaw Rd from Starr Rd to the Town of Fairfield. Expect flaggers. Completed: May 6, 2021.

Bradshaw Rd.: from Starr Rd to Town of Fairfield 
 
Lane restrictions (both directions, all lanes): Motorists need to watch for flaggers.


Ditch cleaning with backhoe on Horton Rd., south of Elder Rd.
 Crew will be ditch-cleaning with a backhoe on Horton Rd., south of Elder Rd. Completed: April 29, 2021.

Horton Rd.: south of Elder Rd. 
 Lane restrictions (both directions, all lanes): Motorists should slow down in work zone.


Ditch cleaning with grader on Bridges Rd from Madison Rd to Elk-Chattaroy Rd.
 Crew will be ditch-cleaning with grader on Bridges Rd from Madison Rd to Elk-Chattaroy Rd. Completed: April 30, 2021.

Bridges Rd: from Madison Rd to Elk-Chattaroy Rd 
Lane Restrictions (Both Directions, All Lanes): Ditch cleaning with grader on Bridges Rd from Madison Rd to Elk-Chattaroy Rd.


Ditch cleaning with grader on Frideger Rd from end of pavement to Darknell Rd.
 Crew will be ditch-cleaning with grader on Frideger Rd from end of pavement to Darknell Rd. Completed: April 30, 2021.

Frideger Rd: from Darknell Rd to End Pavement/Start Gravel
Lane Restrictions (Both Directions, All Lanes): Ditch cleaning with grader on Frideger Rd from end of pavement to Darknell Rd.

 

Euclid Rd Bridge Closure
 Euclid Rd Bridge is closed and a detour is in place. Replacing the bridge is the responsibility of the Burlington Northern Santa Fe Railroad. 

Euclid Rd: from Bridge #1508 Over BNSF to Lyons Rd 
Road Closed – Euclid Rd Bridge Closed

 

Grading and Prepping road for Bentonite application on Ritchey Rd. from Espanola Rd. to Hallett Rd.

Crew is grading and prepping Ritchey Rd. for an application of bentonite from Espanola Rd. to Hallett Rd. Completed: April 29, 2021.

            Ritchey Rd.: from Espanola Rd. to Hallett Rd.

Lane restrictions (both direction, all lanes): Motorists should slow down in work zone.

 

Grading and Prepping road for Bentonite application on Betz Rd. from Andrus Rd. to City of Cheney

Crew is grading and prepping Betz Rd. for an application of bentonite from Andrus Rd. to the Cheney City Limits. Completed: April 28, 2021.

            Betz Rd.: from Andrus Rd. to City of Cheney.

Lane restrictions (both direction, all lanes): Motorists should slow down in work zone.

 

Street Sweeping residential areas from Camelot and working south

Crews are street sweeping residential areas in Camelot and working south.

 

Spokane County crews are repairing potholes and grading gravel roads as the weather permits. 

 