[ARCHIVED] Road construction and maintenance for August 17-21, 2020.

SPOKANE COUNTY PUBLIC WORKS ROAD CONSTRUCTION & MAINTENANCE UPDATE

August 14-21, 2020

For more information: www.spokanecounty.org/publicworks 

ROAD CONSTRUCTION

Bigelow Gulch Phase 5
Progress road is closed for excavation. Completed: 9/30/2020.

Progress Rd: from Forker Rd to Forker Rd
The road is closed and a detour is in place.


Blanchard Creek Road Culvert Replacement
The existing culvert is being replaced. The work includes the removal of existing culverts and building a new structure over Blanchard Creek. Completed: 10/31/2020.

One lane is open. Motorists should expect delays due to flaggers using the roadway or work on the shoulders.


Geiger Blvd-Soda to Grove Rd

The project includes new drywells, asphalt, signage and pavement markings. Completed: 11/30/2020.

Geiger Blvd. from Soda to Grove Rd. is under construction. 


Hazard Road Drainage Improvements

The project includes demolishing the old pavement, excavation for water/pollution control, and redoing the ditches. Completed: 10/30/2020.

Hazard Rd: from Dalton Rd to Dalton Rd
The impacted roads will have one lane open during the day – and two lanes open at night. Motorists should be prepared for possible delays during the day and watch for flaggers.

PRIVATE CONTRACTOR WORK BY PERMIT

Build Strand and Overlash
Build strand and overlash P3-625 from pole #175885 at 5718 N Malvern Rd to pole #400885 at 5717 N Malvern Rd, build 2-inche riser on pole #400885 to service 5615 N Malvern Rd. Completed: 8/21/2020.

Malvern Rd: from Joseph Av to Joseph Av
There are lane restrictions in the southbound lane and the shoulder is closed on the west side of Malvern Rd south of Joseph. Motorists should expect delays and watch for flaggers.

 

Culvert installation across Cheney-Spokane Rd at Fish Lake.
A culvert is being installed across Cheney-Spokane Rd at Fish Lake between Meili Lane and Myers Park Rd. Completed: 8/27/2020.

Cheney-Spokane Rd: from Meili Ln to Myers Park Rd
Motorists should expect delays in all lanes and both directions – please slow down and watch for flaggers.


Greenridge Water System and Booster Station Improvements
Halme Construction (509-725-4200) project includes the installation of a water system, approach, sidewalk, tree trimming/removal, paving/grading the road crossing on Greenridge Drive to the west of Idaho Rd. from 1506 S. Greenridge to 799 N. Greenridge. Completed: 8/18/2020.

Greenridge Rd: from Idaho Rd to north end of road
The road is closed.


Liberty Lake Eastside Water Improvements
Halme Construction (509-725-4200) is replacing the water line on Neyland. Completed: 9/30/2020.

Neyland Rd: from Lakeside Rd to Gage St
Road closed for water line replacement.


Install new Riser and Trench Conduit

Sefnco Communications (509-532-8308) is installing a new riser and trench conduit for Comcast. The work is being done 171-feet to the edge of the driveway and a new pedestrian feature is approximately 4,130-feet east of Harvard Road on the north side of Morris Road. Completed: 8/31/2020.

Morris Rd: from Garry Ln to Garry Ln
There are lane restrictions in both directions. Motorists should expect delays, slow down, and please watch for flaggers and spotters.


Sewer Installation for SP-1637-19 – Full Road Closure
Hattenburg Excavating, Inc. (509-466-3478) is installing a sewer on the north-side of Farwell Rd, approximately 1,090-feet west of Perry St. This requires the road to be completely closed! Completed: 8/20/2020.


Underground Cable Installation
Work is being done by Quanta Telecom (713-629-7600). An underground cable installation of approximately 107-feet. Work will go south on the west side of Harvard. Completed 8/28/2020.

Harvard Rd: from UPRR Crossing #55031 to UPRR Crossing #55031
There will be lane restrictions and the shoulder will be closed.

MAINTENANCE

(Road maintenance projects are subject to change due to weather conditions and other road maintenance priorities)

Asphalt overlay at the intersection of Falcon Ave and Wall St.
Crews are laying fresh asphalt at the intersection of Falcon Ave. and Wall St. Completed: 8/18/2020.

Falcon Av: from Teal Av to Teal Av
Motorists should expect delays in both directions. Please slow down and watch for flaggers.


Asphalt Overlay at the intersection of Post St and Teal Ave. Expect lane restrictions.
Crews are laying fresh asphalt at the intersection of Post Street and Teal Ave. Completed: 8/18/2020.

Post St: from Teal Av to Teal Av
Motorists should expect delays in both directions. Please slow down and watch for flaggers.


Asphalt Overlay at the intersection of Yale Rd and Colbert Rd.
Crews are laying fresh asphalt at the intersection of Yale Road and Colbert Road. Completed: 8/19/2020.

Colbert Rd: from Yale Rd to Yale Rd
Motorists should expect delays in both directions. Please slow down and watch for flaggers.


Asphalt Overlay on Day Mt. Spokane Rd, between Randall Rd and Big Meadows Rd.
Crews are laying fresh asphalt on Day Mt. Spokane Rd, between Randall Rd and Big Meadows Rd. Completed: 8/24/2020.

Day-Mt Spokane Rd: from Randall Rd to Big Meadows Rd
Motorists should expect delays in both directions. Please slow down and watch for flaggers.


Chip-Sealing Upriver Dr from Spokane City Limits to Wellesley Ave.
Crews are chip-sealing Upriver Dr from the Spokane City Limits to Wellesley Ave. Completed: 8/20/2020.

Upriver Dr: from Spokane City Limits to Wellesley Av
Motorists should expect delays in both directions. Slow down, watch for flaggers and follow the pilot cars.


Crack-Sealing Euclid Rd from Dowdy to Trails Rd.
Crews are crack-sealing Euclid Rd from Dowdy to Trails Rd. Completed: 8/20/2020.

Euclid Rd: from Dowdy Rd to Trails Rd
Motorists should expect lane restrictions in both directions. Please watch for flaggers.


Crack-Sealing Flint Rd from 12th Ave to Trails Rd.
Crews are crack-sealing Flint Rd from 12th Ave to Trails Rd. Completed: 8/20/2020.

Flint Rd: from 12th Av to Trails Rd
Motorists should expect lane restrictions in both directions. Please watch for flaggers.


Crack-Sealing Grove Rd from Spokane City Limits to Mission Rd.

Crews are crack-sealing Grove Rd from Spokane City Limits to Mission Rd. Completed: 8/24/2020.

Grove Rd: from Spokane City Limits to Mission Rd
Motorists should expect lane restrictions in both directions. Please watch for flaggers.


Culvert cleaning on Connor Rd from Madison Rd to Sands Rd.
Crews are cleaning out culverts on Connor Rd from Madison Rd to Sands Rd. Completed: 8/20/2020.

Connor Rd: from Madison Rd to Sands Rd
Motorists should expect lane restrictions in both directions. Please slow down and watch for flaggers.


Culvert cleaning on Sands Rd from Madison Rd to Palouse Hwy.
Crews are cleaning out culverts on Sands Rd from Madison Rd to Palouse Hwy. Completed: 8/20/2020.

Sands Rd: from Madison Rd to Palouse Hy
Motorists should expect lane restrictions in both directions. Please slow down and watch for flaggers.


Culvert repair on Salnave Rd between Dover Rd & Granite Lake Rd.

Crews are repairing a culvert on Salnave Rd between Dover Rd & Granite Lake Rd.

Salnave Rd: from Dover Rd to Granite Lake Rd
Motorists should expect lane restrictions in both directions. Please slow down and watch for flaggers.


Euclid Rd Bridge Closure

Euclid Rd Bridge Closure Detour route in place. Work on bridge is the responsibility of the Burlington Northern Santa Fe Railroad.

Euclid Rd: from Bridge #1508 Over BNSF to Lyons Rd
The bridge is closed! A detour is in place.


Idaho Road Bridge closed, between Truax Rd and Sanders Rd

Idaho Road Bridge is closed for major repair work between Truax Rd and Sanders Rd. A detour is in place. Completed: 8/20/2020.

Idaho Rd: from Truax Rd to Sanders Rd
The road is closed and a detour is in place while repair work is underway on the bridge.


Shoulder repair on Prairie View Rd from the Town of Fairfield to the Town of Waverly.
Crews are doing shoulder repair work on Prairie View Rd from the Town of Fairfield to the Town of Waverly. Completed: 8/20/2020.

Prairie View Rd: from Fairfield City Limits (Jackson Rd) to Waverly City Limits (4th Ave)
Motorists should expect lane restrictions in both directions. Please slow down and watch for flaggers.


Shoulder repair work on Garden Springs Rd from Spokane City Limits to Abbott Rd.
Crews are doing shoulder repair work on Garden Springs Rd from Spokane City Limits to Abbott Rd. Completed: 8/20/2020.

Garden Springs Rd: from City of Spokane (Geiger Blvd) to Abbott Rd
Motorists should expect lane restrictions in both directions. Please slow down and watch for flaggers.


Travel Impacts Map: http://www.spokanecounty.org/3828/Weekly-Travel-Impacts-Map 

The mission of Spokane County Public Works is to provide our citizens and the traveling public with safe and maintained roads, 

bridges and stormwater facilities through efficient and quality Operations, Construction, Engineering and Planning services.

www.spokanecounty.org/publicworks 



Facebook Twitter Email