SPOKANE COUNTY TRAFFIC RESTRICTIONS AND
DELAYS
For: 09/07/2018 - 09/13/2018
CONSTRUCTION
2018 Pavement Removal & Replacement
Removing
existing pavement, & replacing the pavement and other work as needed (Regal
Phase 1, Whitworth Phase 2, Liberty Phase 3). Spokane County Public Works:
Construction: (509) 477-3600
Regal Rd:
from 57th Av to 57th Av
Delay
(Both Directions, All Lanes): Watch for Flaggers, be prepared to stop. 09/12/2018
- 10/31/2018
Whitworth Dr: from Hawthorne Rd to Wall St
Delay
(Both Directions, All Lanes): Please watch for Flaggers, be prepared to stop. 09/12/2018
- 10/31/2018
Whitworth Dr: from US-395 to Hawthorne Rd
Delay
(Both Directions, All Lanes): Be prepared to Stop, flaggers may be present. 09/12/2018
- 10/31/2018
Liberty Dr: from Melkapsi St to Tum Tum Dr
Delay
(Both Directions, All Lanes): Be prepared to Stop. Flaggers may be present. 09/12/2018
- 10/31/2018
Bigelow Gulch 5A
Improvement
of the Bigelow Gulch Corridor connecting Forker Road to Progress Road via a new
alignment north of the existing intersection (Forker & Progress). Spokane
County Public Works: Construction: (509) 477-3600
Progress Rd: from Forker Rd to Spokane Valley City
Limits
No
Truck Traffic (Both Directions, All Lanes): Construction beginning on the next
Phase of Bigelow Gulch. Work will be adjacent to Forker and Progress Road. Look
for trucks entering roadway. 05/29/2018 - 12/31/2018
Forker Rd: from Jacobs Rd to Progress Rd
No
Truck Traffic (Both Directions, All Lanes): Road is open. Work will start
adjacent to Forker,
allow extra time, expect delays. Watch for Flaggers. Be prepared to stop.
05/29/2018
- 12/31/2018
Bigelow Gulch/Forker Intersection
Impacts
to Bigelow Gulch from Palmer to Forker due to construction activities for the reconstruction
of the intersection. Spokane County Public Works: Construction: (509) 477-3600
Bigelow Gulch Rd: from Palmer Rd to Weile Av
Delay
(Both Directions, All Lanes): TRUCKS ENTERING ROADWAY-Temporary Signal, be prepared
to stop between the hours of 6am to 5pm Monday through Friday. Signal will
flash yellow after hours. 02/12/2018 - 10/31/2018
Bigelow Gulch Rd: from Forker Rd to Forker Rd
Flaggers
May Be Present (Both Directions, All Lanes): Drivers are now on the temporary alignment.
Speed limit is 25mph from Evergreen to Progress, slow down, use caution and watch
for workers adjacent to roadway. TRUCKS ENTERING ROADWAY-Please use caution. 02/12/2018
- 10/31/2018
Monroe Road Bridge
Remove
and Replace Bridge Over Dragoon Creek. Spokane
County Public Works: Construction: (509) 477-3600
Monroe Rd: from Bridge #2803 Over
Dragoon Creek to Bridge #2803 Over Dragoon Creek - Road Closed: 05/14/2018 - 10/31/2018
Palouse Highway Sidewalk Project
Improvement
of the Palouse Hwy and Sidewalks to include excavation, storm sewer, sidewalk,
curb ramps and plantings. Spokane County Public Works: Construction: (509)
477-3600
Palouse Hy: from 57th Av to 61st Av
Lane
Restrictions (Both Directions, All Lanes): Please watch for Flaggers, there
will be delays. 08/14/2018 - 11/30/2018
Palouse Hy: from 55th Av to 57th Av
Lane
Restrictions (Both Directions, All Lanes): Please watch for flaggers, there
will be delays. 08/14/2018 - 11/30/2018
PRIVATE CONTRACTOR WORK BY PERMIT
513 E HASTINGS
CLOSE
W/B RIGHT LANE OF HASTINGS AV BETWEEN DAKOTA & STANDARD ON 9/20 SO THAT
TRUCKS CAN BACK INTO PARKING LOT - INLAND ASPHALT
Hastings Rd: from Dakota St to Standard Dr
Lane
Closed (Westbound, Right Lane): CLOSE W/B RIGHT LANE OF HASTINGS AV BETWEEN
DAKOTA & STANDARD ON 9/20 SO THAT TRUCKS CAN BACK INTO
PARKING
LOT. 09/13/2018 - 09/21/2018
BLOCK N/B WALL ST TO BUILD RISER ON POLE
BLOCK
RIGHT (NORTH BOUND) LANE OF WALL STREET (BETWEEN IVANHOE & BARNES
RD) DURING WEEK OF 9/10/18 - 9/14/18 TO INSTALL NEW RISER ON POLE - AVISTA
Wall St:
from Ivanhoe St to Barnes Rd
Lane
Closed (Northbound, Right Lane): BLOCK RIGHT (NORTH BOUND) LANE OF WALL
STREET (BETWEEN IVANHOE & BARNES RD) DURING WEEK OF 9/10/18 -
9/14/18
TO INSTALL NEW RISER ON POLE. 09/10/2018 - 09/15/2018
MAINTENANCE
(Road maintenance projects are subject to
change due to weather conditions and other road maintenance priorities)
PROJECT ROSE UTILITY EXTENSION
CLOSE
GEIGER BLVD TO INSTALL CITY SEWER & WATER TO PROJECT ROSE SITE ON GEIGER
BLVD FROM HAYFORD RD TO THOMAS MALLEN RD 8/20/18 - 9/12/18 (3.5 weeks) - PEIRSOL
CONSTRUCTION:
Geiger Bv: from Hayford Rd to Thomas Mallen Rd
Road
Closed: CLOSE GEIGER BLVD TO INSTALL CITY SEWER & WATER TO PROJECT
ROSE SITE ON GEIGER BLVD FROM HAYFORD RD TO THOMAS MALLEN RD 8/20/18 - 9/12/18
(3.5 weeks). 08/20/2018 - 09/15/2018
Asphalt Patch
Repairing
potholes County-wide, this dependent on weather conditions. Spokane
County Public Works-Maintenance: (509) 477-3600
Grading
Grading
operations are dependent upon weather. A Burn Ban is still in effect and we
cannot grade. If we get sufficient rain, roads will be graded. Spokane County
Public Works-Maintenance: (509) 477-3600
http://www.spokanecounty.org/3828/Weekly-Travel-Impacts-Map