Project No: CRP-2989
Project Manager: Mick Flugel
Project Timeline: Construction began on April 24th, 2019 and was completed October 21st, 2019
Project Description: Spokane County Public Works replaced the existing 2 lane road (which had narrow lanes, no shoulders, and multiple vertical curves) with a 4 lane road (with a 12’ turn lane or center median, 8’ shoulders and 12’ climbing lanes where needed).
Bigelow Gulch Road Corridor Projects
Prior to the construction of the project looking South from Old Argonne

Prior to the construction project looking South from Lehman Rd

Prior to the construction project looking south from Transmission Right of Way

After construction was completed October 12th, 2019

After construction was completed October 12th, 2019