West Terrace Stormwater Study

In a competitive bid process, Osborn Consulting was chosen as the consultant to work on a stormwater study for the West Terrace area. This area is located southeast of I-90 near Exit 272. The area is roughly bounded by South Thomas Mallen Road to the east, I-90 to the northwest, and West Melville Road to the south. Land use includes residential, industrial, and light commercial, with The Fairways Golf Course in the central portion of the area.

Work has been ongoing to gather data and create concepts to address drainage issues, which are to be included in a Capital Improvements Plan (CIP). To view the project information, concepts and maps, click here.

A comment period was held for public feedback on the concepts for consideration in the final CIP. The comment period ended on November 15, 2020.

An Open House was previously held November 20, 2019, at Snowden Elementary School, 6323 S Holly Road, Cheney, WA 99004.

This web page will be updated as additional information becomes available.  When the study is complete, options for resolving drainage issues in the area will be shared with the public though public meetings, if possible, or via other forms of distribution.

Project Boundary West Terrace 2020