Hazard Road Slope Failure Mitigation

Hazard Road - Mechanically Stabilized Earth Retaining Wall

Project No: CRP 3257

Project Engineer: Pete Bauman

Project Timeline: 2019 Construction

Current Project Status - The project design phase is complete. The maintenance crew has started excavation work, and the wall construction will begin immediately following the arrival of the materials by Oct. 21st. The roadway paving is scheduled for Oct. 24th. The project could slide into the week of Oct. 28th do to the aggressive schedule. Hazard Road will remain closed throughout the duration of construction. The road is currently planned to be repaired and reopened by the end of November 2019.

Project Description - This project will implement a mechanically stabilized earth wall to mitigate the slope failure. The compromised outboard lane will be excavated and reclaimed. The undermined guard rail, curb, and pavement will be replaced as needed.


  1. Pete Bauman

    Project Engineer
    Phone: 509-477-3600

  2. Public Works


    Physical Address
    1026 W Broadway Avenue
    Public Works Building
    Spokane, WA 99260-0170

    Phone: 509-477-3600
    Fax: 509-477-7655