Final Digital Flood Insurance Rate Maps (DFIRM) along with an updated Flood Insurance Study (FIS) have been issued by FEMA and will be effective July 6, 2010.
The Stormwater Utility ensures that stormwater systems are planned, developed and maintained to prevent flooding, protect water quality and preserve natural stormwater systems.
To submit a Traffic Control Plan (TCP) for review to Spokane County, please fill out the following form along with a TCP drawing and fax it to "Spokane County Traffic" at 477-7478 (fax number).