|
| ||||||||||||||||
Courthouse History |
|||||||||||||||||
|
Page Topics Introduction, Contest for Courthouse Design, A Castle in Spokane!, A New Jail next to the Courthouse, A Multi-Use Building, Ongoing Changes
You might not expect to come upon a castle while visiting Spokane, but
that is exactly what you will do if you visit the Spokane County courthouse. Most of us
associate such architecture with romantic old castles in Europe, or perhaps something out
of the world of Walt Disney or fairy tales. To find such a building in the center of a
modern, growing regional hub city such as Spokane is a bit startling.
How did this come about? You'd expect such a building must have a colorful
past, and our courthouse does not disappoint!
When the first ground was broken in the fall of 1893, Spokane was still a
boomtown that had been suffering from the financial panic of 1893. The project itself was
designed in part as a stimulant for a faltering economy in those hard times. At first, there
was some bitterness from the initial decision to place the structure on the north bank of
the Spokane River. Downtown business owners had hoped to keep the building in the central
business district. Residents from the southern and western parts of the county lobbied the
county commissioners to select a more rural location. One man even told the Board that
if they put the courthouse in Spokane, then those outlying parts would secede and form a
new county. There was also harsh criticism that the building itself was an extravagant
waste of public funds.
But the full story of the courthouse began almost a decade earlier when in
1887, colonel D.P. Jenkins donated the land and $1,000 for the construction of the new county
courthouse. But it was not until 1893, when leaky roofs and other problems of the old courthouse
became painfully apparent, that the Board of County Commissioners decided to act on Jenkins' offer.
On June 7, 1893, the Board officially opened the design competition for the new
structure of "brick and stone or stone as near fireproof as practical to include commodious
vaults for records, plumbing, heating, sewerage, closets, and everything necessary for the
courthouse and jail to cost no more than $250,000." A prize would be awarded for the most
original plan! Prizes were awarded as follows: Winning design 5% of the cost of construction,
second prize $500, third prize $300, fourth prize $200.
The architect who submitted the winning design for the courthouse was W. A. Ritchie,
then just 29 years old. He never attended a formal school of architecture, having received his
initial training from a correspondence course conducted by the superintendent of architecture
in the U.S. Treasury Department. Before moving to Spokane, he designed and supervised the
construction of public buildings and courthouses in Seattle, Bellingham, Port Townsend, Vancouver
and Olympia. He had arrived in Spokane just the year prior to winning the courthouse design
competition. Kirkland Cutter, the renowned Spokane architect who designed the Monroe Street Bridge,
took second place in the competition.
On August 4 1893, Mr. Ritchie submitted his detailed drawings for the new courthouse
and the Board of County Commissioners ordered that notice to contractors be advertised in the Spokane
newspapers, giving details of the plans of Mr. Ritchie. From Oct 25th to Oct. 28th, 1893, the commissioners
studied submitted bids and finally ordered the contract to be awarded to David B. Fotheringham,
and John Keenan was appointed superintendent of construction. Construction began in October 1893,
but the building really began to go up the following spring. The brick was manufactured locally by
Washington Brick and Lime Manufacturing Company of Spokane. The roof was made from imported slate shingles.
Work was suspended on the courthouse in March 1895 as a quarrel broke out between
Ritchie and the superintendent of construction. The commissioners asked Ritchie to resign, he refused,
and a grand jury investigated charges of 'Fraud and Swindling" in connection with the courthouse. The
jurors concluded: "We have sifted these charges thoroughly, find them untrue, malicious and wicked,
having been made by parties who must have known differently, and made for the purpose of misleading
the people generally, and this surely and particular. Hard times, prejudice and disappointment must
have been at the root of the matter. We find the courthouse to be one of the most substantial and
well-built offices in this or any other state, and built in accordance with the plans and specifications,
excepting changes that were duly authorized. We find no evidence of boodle or corruption and we believe
there has been none." The courthouse was finally completed in November 1895. All county officials had
moved into quarters in the new courthouse by Nov. 20, 1895.
The courthouse is said to closely resemble two famous 16th century chateaux
in the Loire Valley of France, the Chateaux de Chambord, built in 1519 and the Chateaux d'Azay
Le Rideau built in 1516. Many architects through the years have commented on the masterly replica
of a 16th century French Renaissance design, its fine lines of style and proportion with regard to
the towers and turrets, the sculpture, iron and brickwork which excel in pattern and craftsmanship.
Detailed exterior trim such as shell patterns with wreaths and festoons and decorative arches are a
few of the outstanding features of its design. The beautiful center tower, now lighted at night,
is a masterpiece of detail in itself.
Adjacent to the Courthouse was the new jail. The first man booked into the jail
was a James Kershaw on a charge of grand larceny. The last entry under his name reads, "Disposition
of case - escaped." Hangings were held in the courtyard between the jail and the Courthouse.
The most famous case involved George Webster in 1899. More than 300 invitations, bordered in
rope, tied in a hangman's noose and bearing a picture of Webster, were sent out.
The courthouse was also the scene of at least one violent episode a year after
it opened. On August 1, 1896, Lou H. Plattor, an attorney and politician, was shot by Henry Siefert
in the second floor corridor outside a courtroom. Newspaper accounts give a sketchy picture of what
actually happened. But Siefert was apparently angered by what he thought were derogatory remarks
about his character by Plattor, who also apparently struck Siefert with a cane. Siefert then, out
of retaliation or self-defense, pulled his gun from his jacket and shot Plattor dead. Siefert was
charged with murder, but the jury acquitted him.
In 1897, another scandal erupted when a news article reported that county employees
were actually living in the courthouse, using it as a hotel for their families. According to the article:
"There are times and places when the odor of boiled cabbage and other delicate edibles is not offensive.
In a courthouse, however, almost at any time, such odors are hardly keeping with the surroundings."
Soon after the article appeared, the county commissioners dealt with the problem. A later article
reported: "The odor of fried onions, sauerkraut, oysters and mushrooms was less pronounced than
heretofore, and the prospect is that the county will not hereafter engage extensively in the hotel
business."
Remodeling has been done over the years to meet the growing needs of the county.
In 1953, the old Public Health Building on the northwest corner of the courthouse block was razed
to clear the way for the present four-story courthouse annex. It was hoped that the annex would take
care of the county's needs for the next ten years. The first floor was assigned to the Sheriff's
department, the second floor went to the three justices of the peace, the third floor to the county
prosecutor, and the fourth floor was unassigned for the time being with no immediate plans. At that
time, the courthouse also housed many other departments as well, including Planning, Engineering and
Parks and Recreation.
Today, the Spokane County Courthouse houses the offices of the Board of County
Commissioners, Assessor, Treasurer, Auditor, Clerk, and Superior Court courtrooms, offices, and
support services. The Courthouse Annex houses the Auditor's Motor Vehicle Licensing Office, the
Counsel for Defense, and the Superior Court Administrator's Offices. The Sheriff, Prosecutor, and
Jail and moved to the Public Safety and Jail buildings north of the Courthouse and Annex. Planning
and Engineering are now located in the Public Works Building south of the Courthouse, while Parks
and Recreation have offices on Havana next to the County Fair and Expo Center.
Spokane County takes pride in its 'castle' showcase building. Improvements and
renovations have occurred over the years to improve both the functionality and efficiency of the
building. Windows were replaced recently, which has greatly improved the energy efficiency of the
building. At that same time, the outside brickwork was cleaned and re-sealed. The Courthouse is
surrounded by manicured lawns, shrubs and trees, wonderfully framing this beautiful historic treasure!
|
|||||||||||||||||||
|
Last Modified On: 2/22/2008
|
|
|