Country Homes Blvd Ph 2 Wall St to Division St/US395

Construction for the Country Homes Boulevard Phase 2 - Wall to Division project is anticipated to start in July 2016. This project involves constructing a stormwater facility within existing islands of Country Homes Boulevard that incorporates both disposal and water quality treatment. Country Homes Boulevard is a high average daily traffic (ADT), road located just north of the Spokane city limits and extends from Wall Street to State Route 395 (Division Street), approximately one mile in length.
Country Homes Boulevard Construction Example 1

About the Future Facility

The facility will be a network of catch basins and pipes that collect and convey stormwater to bioinfiltration swales constructed in the existing center islands. The swales will be designed to treat and detain the stormwater generated by the pollution generating impervious surfaces, or PGIS, of the Country Homes Boulevard corridor. Drywells will be installed in the swales for stormwater overflow replacing existing drywells that do not have a treatment element. Country Homes Boulevard is an urban principal arterial with an ADT of 17,335.

This project is located over the Spokane Valley-Rathdrum Prairie aquifer which is designated as a sole-source aquifer by EPA, and provides drinking water for 500,000 people. This project is being designed in accordance with the Spokane Regional Stormwater Manual which is an Ecology-approved, equivalent manual to the Stormwater Management Manual for Eastern Washington.

Open House

An Open House for neighboring properties was held on January 7, 2016. View the costs, schedule, and other displays (PDF) that were available for viewing at the Open House.

Construction is anticipated to start in July, 2016 and is expected to be completed by the end of October, 2016.
Country Homes Boulevard Construction Example 3
Country Homes Boulevard Construction Example 2